| |
PriMus |
PriMus IFC |
PriMus PLUS |
PriMus FULL |
| COST ESTIMATE, BOQS AND QUOTES |
| BoQ and work estimate |
|
|
|
|
| Bids and proposals |
|
|
|
|
| Analysis of construction site needs |
|
|
|
|
| Accounting |
|
|
|
|
| Importing and exporting to standard formats (XLS, DOC, ...) |
|
|
|
|
| Import of databases, price lists and price books |
|
|
|
|
| QUANTITY TAKE OFFS FROM IFC FILES |
| Open IFC standard formats of BIM or 3D CAD models |
|
|
|
|
| View and navigate 3D BIM or CAD models directly in the integrated viewer |
|
|
|
|
| Assignment of Price List items to BIM or 3D CAD objects |
|
|
|
|
| Automatic measurements with artificial intelligence from 3D BIM or CAD model |
|
|
|
|
| Constantly updated cost estimate when editing the 3D BIM or CAD model |
|
|
|
|
| Data export in Word™, Excel™ formats |
|
|
|
|
| QUANTITY TAKE OFF FROM CAD DRAWINGS OR RASTER FILES |
| Opening of standard DXF/DWG CAD DRAWING FILES |
|
|
|
|
| Raster (PDF, BMP, JPG, etc.) management |
|
|
|
|
| Associate Price list items to graphical entities |
|
|
|
|
| Quantity Takeoff from CAD files |
|
|
|
|
| Quantity Takeoff from PDF files |
|
|
|
|
| Take off from image files |
|
|
|
|
| Dynamic BoQ updating when editing drawing models |
|
|
|
|
| Connection with your CAD or your CAD environment in PriMus TAKEOFF |
|
|
|
|
| CONSTRUCTION SCHEDULING |
| Integration with other Project time Schedules or construction cost estimates |
|
|
|
|
| Works financial plan analysis and control |
|
|
|
|
| Works resources analysis integrated with the construction cost estimate |
|
|
|
|
| Work resources analysis integrated within the BoQ document |
|
|
|
|
| Job resources requirements analysis |
|
|
|
|
| Activity scheduling, resources analysis between the design and construction phases |
|
|
|
|
| Data export in Excel and PDF |
|
|
|
|
| GANTT, charts and reports printout management |
|
|
|
|